e-Wall 2.0 Change Log


July 2026

Added EPS ensemble stamp graphics, expanded HRRR regional coverage, extended HRRR synoptic runs through 48 hours, and improved status monitoring for HRRR, RTMA, NBM, ensemble stamps, and four-panel products.

Improved reliability and error reporting for several operational plotters, including HRRR, GFS four-panel, NBM, GEFS, REPS, and EPS.

Restored broken NBM and RTMA products.

April 2026

Released postage stamp graphics.

Added the RAP analysis archive.

September 2024

Added operational HRRR graphics.

July 2024

Released the six-panel global model viewer.

April 2024

e-Wall 2.0 is live. Added several preliminary products, including RAP analysis, long-range maps, and current conditions.